|
|
Next
|
Bolt-on Installation of Flotation Pods / 08 |
Photo by J. Phil Arnold E-Mail: PhotoArt@jphilarnold.com Web Site: www.jphilarnold.com |

Time for a Break
After applying a liberal amount of sealant to the surface of the pod (around each hole and near the outer edges of the pod) I secured the pod to the transom with two bolts. I then applied the sealant to each reinforcing strip and installed the reinforcing strips and all of the eight main mounting bolts. I worked as quickly as possible to get all of the bolts in place and tightened before the sealant became too stiff to adhere properly. With the first pod installed, I was able to rest a bit before starting the same process for the second pod.
Use the scrollbar at the left of this window to view all the thumbnails in this section.